Latest restoration news
Wb 299 frame and wheels at Paekakariki, 1998. PHOTO: Hugh McCracken.
Progress to date
Progress has been intermittant, often halted by the weather as the locomotives are stored outside.
- Both boilers have been cleaned down, de-tubed and removed from the frames.
- Wheels have been removed from the frames;
- Frame of Wb 299 has been stripped of all components excepting the cylinders.
- Rear plate frames have been unbolted from the bar frames, irrevocably corroded and twisted.
- An attempt has been made to straighten the frame.
This page will always display latest restoration news, previous news pages will be saved in date order, newest to oldest.
Next page: Objectives.
Home . Trust . Salvage . Restoration . History . Wb 292 . Wb 299 . Wd 356 . Baldwin locos . Research . New+revised . Links . Contacts
Page last updated 17 November 2002. © Hugh McCracken